SOP's

The CFMM has two sets of Standard Operating Procedures, one for the new 3T/7T MRI Facility and another for the 9.4T small bore animal facility.  The SOP's for both facilities are listed below with links to downloadable pdf's.  Anyone wishing to obtain secure access to the facility must read, understand and sign off on these SOP's. 

3T/7T MRI Facility SOP's

Please Read First:  Disclaimer
SOP#100-01: MRI Facility Access Approval Policy
SOP#110-01: MRI Facility Visitor Approval Policy
SOP#120-01: Safety and Operator Training
SOP#130-01: New Protocols and Ethics
SOP#200-01: General Safety
SOP#210-01: Emergency Code Blue
SOP#220-01: Emergency Fire
SOP#230-01: Emergency Quench
SOP#300-01: General Experimental
SOP#310-01: 3T MRI System Start-up
SOP#320-01: 3T MRI System Shutdown
SOP#330-01: 3T MRI Black/Brown Out
SOP#340-01: MRI Equipment Handling and Procedures
SOP#350-01: Incidental Findings
SOP#400-01: System Billing Guide and Standard Rates
SOP#410-01: MRI Data Handling
SOP#900-01: 3T MRI End of Session Protocol
Appendix: Magnetic Resonance Environment Screening Form
Signature Sheet

9.4T MRI Facility SOP's

SOP#100-01: Facility Access
SOP#105-01: Visitor Approval
SOP#110-01: System Scheduling and Billing
SOP#200-01: Safety and Training of Personnel
SOP#205-01: General Safety Guidelines
SOP#210-01: Personal Protective Equipment
SOP#300-01: General Experimental Guidelines
SOP#305-01: MRI Equipment Handling
SOP#310-03: MRI System Startup
SOP#315-03: MRI System Shutdown
SOP#320-01: MRI Data Handling
SOP#325-02: Emergency Quench Procedure
SOP#330-02: Emergency Fire Procedures
SOP#335-03: Insert Gradient Coil Changeover 305/210 to 205/120
SOP#340-03: Removal of the Insert Gradient Coil 205/120 to 305/210
SOP#400-01: Animal Exposure & Health Issues
SOP#415-01: Cleaning and Decontamination - Level 1 & 2 Experiments
SOP#500-01: Biosafety Level 2 Work in the 9.4T MRI Facility